Integrated Monitoring System Employed for 10MW Solar Plant

Fig. 7: The cable rack was raised as high as the foundations as a measure against flooding. (source: Nikkei BP)

Fig. 7: The cable rack was raised as high as the foundations as a measure against flooding. (source: Nikkei BP)